• Natural Gas News

    GhanaWeb: Aboadze Thermal Plant Reverts to Crude Oil Use

    old

Summary

Ghana's Volta River Authority (VRA) has switched its Aboadze thermal plant from gas to oil as a result of the shutdown from Tullow's Jubilee field FPSO

by: Erica Mills

Posted in:

Press Notes, Africa

GhanaWeb: Aboadze Thermal Plant Reverts to Crude Oil Use

The Volta River Authority (VRA) has reverted to the use of light crude at its thermal plant at Aboadze in the Western Region.
It followed the disruption of gas supply from the Atuabo Gas Plant.

The interruption followed a shutdown of the Floating Production Storage and Offloading vessel, (FPSO) Kwame Nkrumah, for maintenance works.

Read the full article HERE.