Empire successfully drills C-2H well in Beetaloo
Empire Energy has successfully drilled, cased, and suspended the C-2H well in its 100% owned and operated EP187, located in the Beetaloo sub-basin, Northern Territory, it said on December 17.
C-2H is now awaiting fracture stimulation and production testing to start in Q2 2022. About 192 m of liquids-rich shale gas net pay was intersected across the four middle Velkerri pay zones in C-2H vertical hole, Empire said. The well was drilled to a total measured depth of 3,150 m with the horizontal section length being 1,345 m and wholly placed within the Velkerri B shale target window.
Advertisement: The National Gas Company of Trinidad and Tobago Limited (NGC) NGC’s HSSE strategy is reflective and supportive of the organisational vision to become a leader in the global energy business. |
Petrophysics from the C-2H vertical hole along with revised mapping from the Q4 2021 Charlotte 2D seismic survey and 2019 Broadmere survey will be provided to Netherland, Sewell & Associates (NSAI) to update Empire's EP187 contingent and prospective resources report.
Empire expects to release the updated NSAI certified contingent and prospective resources report during Q1 2022.