• Natural Gas News

    Iran Could Take Five Years to Become Major Gas Exporter

    old

Summary

Even after sanctions are lifted it will take Iran at least five year to become a large gas exporter.

by: shardul

Posted in:

Asia/Oceania

Iran Could Take Five Years to Become Major Gas Exporter

Even after sanctions are lifted it will take Iran at least five year to become a large gas exporter, said Fitch Ratings in a note published Friday.

“Even if international sanctions on the country are lifted, it will take at least five years to ramp up production and build the pipelines necessary to become a large gas exporter. The higher cost and complexity of liquefied natural gas (LNG) projects means significant LNG exports would take a decade or longer to materialize,” Fitch said.

Several significant gas projects in Iran are in different stages of implementation. Iran's share in estimated proven reserves of the giant South Pars gas field is about 14 tcm, while its current production capacity is only about 107 bcm. The IEA expects 67 bcm of additional capacity to be commissioned at South Pars before the end of this decade. Another major project is the North Pars field with estimated reserves of 1.3 tcm. In 2006, the China National Offshore Oil Corporation signed a $16bn deal to develop North Pars and build a 20 million tons per annum LNG plant. These projects have faced significant delays due to international sanctions.

From 2005 to 2014 Iranian gas production increased nearly 70 percent to around 173 billion cubic meters (bcm). In the meantime, Iran's gas consumption has increased dramatically, rising 66 percent between 2005 and 2014 to 170 bcm, Fitch said.

“This rate of growth has been second only to China and has made Iran the world's fourth biggest gas consumer behind the U.S., Russia and China. We therefore expect a significant part of the newly commissioned capacity over the next few years to continue serving the domestic market,” the note stated.

Iran is planning a number of gas export pipelines pending the removal of international sanctions. One example is IGAT-9, a 35 bcm per year pipeline that Iran plans to use to send gas from South Pars to Europe via Turkey. There are currently no transit pipelines in Turkey to deliver gas to the European markets. The only pipeline currently under construction there, the 16 bcm Trans-Anatolian Natural Gas Pipeline (TANAP) is scheduled for completion by 2019 and would bring 10 bcm of Azeri gas via Turkey and Greece to Italy via another yet-to-be-constructed Trans Adriatic Pipeline (TAP).

“While it may be possible to increase the throughput of TANAP and TAP to accommodate Iranian gas by building one or several gas compression stations, we estimate that such construction as well as gas production ramp-up in Iran could take several years. Therefore, Iran could become a large gas exporter by the end of this decade at the earliest. Developing LNG capabilities is more costly and would probably take longer, and we do not expect Iran to export large volumes of LNG before mid-2020s,” Fitch concluded.