GhanaWeb: Phase Two of Gas Infrastructure Project Ongoing - Sinopec
Sinopec International Petroleum Service Corporation says it has begun the Front End Engineering Design (FEED) for the next phase of the Ghana Western Corridor Gas Infrastructure Development Project.
Mr Mushtaq Kaloo, Sinopec’s Engineering Advisor on the Ghana Early Phase Gas Infrastructure Project told journalists at the Atuabo Gas Processing Plant, that the FEED would allow them to determine the specifications of the project, including costs, capacity, pipeline routes and other details.
Read the full article HERE.