• Natural Gas News

    Graphic Online: Sunon Asogli Back On Stream, After Two-Day Shut-Down

    old

Summary

Sunon Asogli Power Ghana Limited has said it is aiming for secure supply despite interruptions from the West African Gas Pipeline

by: Erica Mills

Posted in:

Press Notes, Africa

Graphic Online: Sunon Asogli Back On Stream, After Two-Day Shut-Down

Sunon Asogli Power (Ghana) Limited has assured that it would continue to produce its 180 megawatts of power daily as long as it received the requisite gas supply from the West African Gas Pipeline.

Mr. Kweku Shaw Lee, Chairman of Sunon Asogli Power Ghana Limited, an independent Power Producer, said although it had some challenges with consistency of gas supply from the WAGP, which sometimes caused it to halt production, it was committed to helping alleviate the effects of the current power crisis by producing up to their full capacity when gas was available.

Read the full article HERE.