• Natural Gas News

    ABB Wins Contract to Deliver Control Infrastructure for TANAP

    old

Summary

ABB has the contract to deliver the control infrastructure for the 1,850 km Trans-Anatolian Natural Gas Pipeline (TANAP).

by: Shardul

Posted in:

Asia/Oceania

ABB Wins Contract to Deliver Control Infrastructure for TANAP

ABB has the contract to deliver the control infrastructure for the 1,850 km Trans-Anatolian Natural Gas Pipeline (TANAP), the company said in a press note published Tuesday.

The Swiss firm will contribute to safe, secure and reliable operation of the pipeline which will bring Azerbaijan’s natural gas directly to Europe.

The $11 billion pipeline will interconnect with two others: the South Caucasus at Turkey’s border with Georgia and the Trans Adriatic at its border with Greece. The gas will come from the Shah Deniz 2 field in the Caspian Sea and it will enter the European network in Italy. It will cross the whole of Turkey, with TANAP forming the central section of the $45 billion Southern Gas Corridor.

ABB will deliver the control system, telecommunications, pipeline monitoring, security systems including fiber-optic cables to transmit data along the pipelines. The pipeline will be controlled and automated by ABB’s world-leading System 800xA process automation system. The software solutions will integrate the supervisory control and data acquisition (SCADA) systems and the telecommunications that control the gas flows, detect leakages or intrusions and make closed circuit television (CCTV) coverage available for safety and security purposes.

TANAP is a special-purpose company with SOCAR of Azerbaijan, BOTAS of Turkey and BP as shareholders.